Four Family Friend roofers laying shingles across the roof of a two-story brick house, with bundles of shingles staged on the slope

Roof Installation in Austin and DFW

Building new or adding on? We install asphalt shingle,
metal and custom roof systems, and our own crew does the work.
Most homes take one to several days.

  • Asphalt shingle
  • Metal
  • Custom roof systems

The short version

  • New builds & additions

    We install new roofs for new builds and additions, using our own trained crew.

  • Built for heat & hail

    Underlayment, flashing and ventilation matter just as much as the shingle on top.

  • Planned installation

    Installation is planned work, set ahead of time. Have an active leak? See roof repair.

  • Already have a roof?

    If your roof is already damaged or aging, you likely want a replacement instead.

  • Price & timeline upfront

    After a free inspection, you get a clear price and timeline before any work starts.

What you may be seeing

  • A new home
    or an addition

    The roof needs planning early, with slope, layout and ventilation worked out.

  • A material
    decision

    Asphalt shingle, metal or a custom system each suit different houses and budgets.

  • A builder who
    needs a roofer

    We work with homeowners and builders on new construction.

  • A tie-in to an
    existing roof

    An addition has to meet the old roof without creating a place for water to get in.

Why new roofs fail early

Installation makes the difference

Most new roof problems trace back to how the roof was installed, not to the material. Rushed work and poor ventilation lead to leaks and early wear, and even high-quality materials can fail when they are installed badly.

Built for local conditions

A roof here has to be built with hail and heat in mind from day one. New houses are everywhere in this market. The Census Bureau puts the median home in Leander at 2013 and in Bee Cave at 2012. NOAA logged 54 hail reports within five miles of Leander from 2016 to 2025. A new roof in that area can expect to meet hail early.

Drone view of a two-story house during a new roof: blue underlayment going down over the decking, new brown shingles on the front slope and bundles of shingles near the ridge
  • 54 hail reportsWithin five miles of Leander, 2016 to 2025
  • 2013Median home year, Leander
  • 2012Median home year, Bee Cave

Hail counts: NOAA Storm Events Database, 2016 to 2025. Home ages: US Census Bureau, American Community Survey, 2024 5-year.

What we do

  • Roof design

    Structure, slope, ventilation needs and layout worked out first.

  • Material options

    Asphalt shingle, metal and custom systems, explained at the start.

  • Underlayment and flashing

    Installed to reduce moisture buildup and stand up to storms.

  • Ventilation

    Set up so heat and moisture move out of the attic.

  • Our own crew

    Our trained team installs every roof, with one point of accountability.

  • Final
    walkthrough

    We inspect the finished roof and walk it with you.

Contact Us

Proof for this job

Aaron Bernard holds Roofing License #03-0749 from
the Roofing Contractors Association of Texas.

We are a CertainTeed Select ShingleMaster
contractor, and our own team installs every roof.

Drone view from above of a large single-story house with new plywood decking across the roof, blue underlayment over part of it and the crew at work
Before: new decking down, underlayment going on
Drone view from above of a single-story house with its finished gray shingle roof and a chimney near the ridge
After: the finished shingle roof

“The roof was complete by a professional crew all in one day and the clean up was amazing. Once complete, there was no sign of anyone being there other than a new, gorgeous roof that adds so much to the house.”

Karrie Krumlauf, Google review

2‑year workmanship warranty

Every full roof installation comes with our standard 2‑year workmanship warranty.

What happens, step by step

  1. You call or
    send the form

    Tell us about the build,
    the plans and your
    timing.

  2. Inspection
    and planning

    We evaluate the
    structure, ventilation
    and design.

  3. Materials
    and price

    You pick the system
    and see the price and
    timeline before
    work starts.

  4. Our crew
    installs it

    Our own crew does the
    job. Most residential
    installs take one to
    several days.

  5. Final
    walkthrough

    We go over the finished
    roof with you.

What happens if you wait

On a new build, the cost of waiting is the schedule.

  • Schedule delays

    Other trades are waiting on a dry house.

  • Storm exposure

    An open structure is exposed to the next storm.

  • Fewer choices

    A late roof decision can limit materials and layout.

Bring us the plans early, and we can talk through what fits the house.

Roof Installation questions

How long does a new roof installation take?

Most residential installations take one to several days, depending on size, material and weather. Larger properties and metal systems can take longer. You get a clear timeline before work begins. Our own crew does the installation, and we walk the finished roof with you.

What materials do you install?

We install asphalt shingle, metal and other durable roofing materials. During your inspection we explain the benefits of each one, so you can choose what fits your property and your budget. Bring us the plans early, because a late decision can limit your choice of materials and layout.

Is an inspection required before installation?

Yes. A detailed inspection helps us evaluate structural needs, ventilation and the design. Our inspection is free, and it makes sure the roof design fits the building and the code. You get the price and the timeline before any work starts.

Do I need installation or replacement?

Installation is typically for new builds or structures with no existing roof. If your roof already exists and is damaged or aging, you likely need a replacement. We can tell you which at the inspection, and the inspection is free.

Book a free inspection for your roof

Round Rock office

(512) 975-1599

DFW office

(817) 674-1494

Mon to Fri, 8 am to 6 pm

What happens next

  1. Inspection
  2. Planning
  3. Installation/repair
  4. Final walkthrough

Free roof inspection request

What do you need? Pick any that apply.

Have your insurance report? Pick Free inspection to go over it with a pro.